Details: part - a ( material)following material supplied by the contractor:- holding clamp for dropper t-off top stone pad carriage including loading,unloading & proper stacking of following stock materials from store/departmental store to dump site distance 0 to 70 kms. (distance approx) pcc pole 8.5 mtr. long ab cable 3x50 transformer 25 kva other matching materials dragging of pcc pole from dump site to pit site fabrication and errection of double pole support on pcc pole pole including grouting with 1:4:8 ratio cement, sand & brick ballast& including digging of pit and fixing of all accessories clamp & earthing as per respo norms. (cost of clamps borne by contractor) stringing, sagging, binding and jumpering of ab conductor (3x50) as per resspo norms grouting and binding of stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per resspo norms earthing of poles as per respo norms mounting of 25 kva transformer as per resspo norms.
Sector: Distribution