Details: construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 (including labour cess excluding g.s.t.) construction of subgrade and earthen shouldersconstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site,spreading, grading to required and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause303.1 (including labour cess excluding g.s.t.) granular sub-base with well graded material (table 400.1) (a)by mix in place method construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixin
Sector: PWD