Details: bituminious workwbm grading 3-providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405. (a)by manual means providing, laying, spreading and compacting graded stone aggregate to eta/wet mix macadam conforming to table 400-13 of morth specification including premixing the material with water at omc in mechanical mix plant with 1% ordinary portland cement and 3.5% emulsion ss-2 stab,carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.as per morth spacification clau
Sector: PWD