Details: supplying & laying cc 1 : 6 : 12 cement with core sand and 4cm brick ballast with all comp of work providing & laying rcc 1 : 2 : 4 cemnet with core sand and 2 cm stone grit with all comp of work providing & laying reinforceemnt mild steel bar including cutting bending etc. dissposal of malwa up to 8 km distance from work site 70% e/work in excavation in ordinary soil all comp of work s/ f of granne stone for inogration of work as per specified dirowing & desing etc all comp of work providing & laying tack with bituman emulsion@0.20kg/sqm & including of all comp of work supplying & laying 50mm thick b m layer using crushed aggrigate of garding premixed with 60/70grade imulsion@3.5% of total mix i/c all comp of work supplying & laying 25mm thick sdbc using crushed agg(10mm nominal size premixed with crbm 55@5% of mix & all comp of work supplying & stacking of 22.4 to 53 mm size ram nagar stone ballast with screening material with load unloading charges i/c all comp of work l
Sector: RDPR