Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling watering and ramming excavated earth into the trenches or in to the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer -in-charge upto a distance of 30 m. from the foundation trenches.s i no. 251(a) providing concrete for plain concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202
Sector: RDPR