Details: civil workmaking the opening in brick masonry including dismantling in floor or walls by cutting masonry and making good the damages to walls, flooring and jambs complete, to match existing surface including disposal of mulba/ to the nearest municipal dumping ground, all complete as per direction of engineer-in-charge. for door/ window/ clerestory window demolishing brick work manually/ by mechanical means includingstacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete dismantling stone slab flooring laid in cement mortar including stackingof serviceable material and disposal of unserviceable material w
Sector: Buildings