Details: civil work earth work in filling in ordinary soil (carted earth), excavation to be in the form or regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layer including ramming & dressing the surface to required level and slopes and also including lift up to 1.5m and lead up to 8 km the earth cutting to be deposited as spoil banks within 30m distance as per directed by engineer in charge as per uppwd sor 2022 si.no. 253. excavation in foundation in ordinary soil incluidng filling lift up to 1.5 m and lead up to 30 m & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation trenches or plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 m from the foundation trenches including all t&p etc. complete as per uppwd sor 2022 s.i. no. 251. cement concrete with 4 cm gauge brick ballast, sand of 1.25 fm, and cement in pr
Sector: RDPR