Details: surface dressing of ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5 m. all kinds of soil. earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge 2.1.1. all kinds of soil. excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20cm in trenches, plinth, sides of foundation etc. complete providing & laying of c.c. in 1:4:8 with cis and 40 mm g.s.b. in foundation of floor i/c all labour, materials and t&p etc. r.c.c. work in column/slab/wall 1:2:4 with cement, coarse sand, 20 mm gauge stone grit all complete m150 brick work in 1:6 c/s mortar in sub- structure iic all labour & t&p etc. 12 mm thick iner
Sector: RDPR