Details: renewing patries 1.00 mtr. width including dressing surface filling up to 8 cm.(3") depth and making namunas at every 15 meters (49") a part on both side of the road true to patri template with side slopes of 1:2 etc. trenches for taking the earth to be so dug. that they from a continuous side drain at road boundry. as per si no. 764 (including labour cess, royalty but excluding gst.) w.b.m. g-3 (22.4-53 mm stone ballast) providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405. (including labour cess, royalty but excluding gst.) providing and applying tack coat with bitumen vg-10 using pressure distribut
Sector: PWD