Details: part -a (site prepration) clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. excavation for roadwork in soil with hydraulic excavator of 0.9 bucket ) capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3 extra cartage of earth up to 10.0 km distance excluding loading and un loading all complete of work part-b (road work) excavation for roadwork in soil with hydraulic excavator of 0.9 bucket ) capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to
Sector: Urban Authority