Details: desilting/excavation of foundation in ordinary soil (loam, clay or sand)/under water earth including lift up to 1.5m and lead up to 50m. filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation c trenches or into the plinth and disposal of surplus earth up to a distance of 50m. from the centre of the foundation trenches including all labour. t&p etc. complete diversion of nala drain water in 20 m distance by using hume pipe of 200 mm dia including supply of all materials, labour. t&p etc. complete. dewatering of nala water by pumping set during construction of works including supply of all materials labour t&p etc. complete. sand filling in sub structure including supply of necessary quantity of sand from a distance not exceeding 10km. from the site of work and including watering, dressing, etc. rate to including supply of all material labour t&p etc. complete laying of pcc on sand bedding in proportion of 1:4
Sector: RDPR