Details: earth -work in exacavation in foundation in ordinary soil, loam, clay or sand including lift upto 1.5m & lead upto 30m including filling watering & ramming of excavated earth in to the trunches or in to the space between the building & the side of foundation tranches or in to the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (excluding royalty) filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. providing and laying cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and t&p etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation making plinth protection 50mm thick of cement concrete 1:
Sector: Industry Development