Details: surface dressing of ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal ]of , lead up to 50m and lift up to 1.5m all kinds of soil earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5m in width as well as 10sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5m as directed by engineer-in-charge 2.1.1 all kinds of soil. excavating, supplying and filling 01 local carth (including royalty) by mechanical transport upto a lead of 5k m also including ramming and watering of the earth in layers not exceeding 20cm in trenches, plinth, sides of foundation etc. providing & laying of c.c. in 1:6:12 with c/s and 40 mm g.s.b. in foundation of floor i/c all labour ,materials and t&p etc. r.c.c. work in column 1:2:4 with cement coarse sand, 20mm gauge stone grit i/c all comp. m150 brick work in 1:6 c/s morter in sub-structure i/c all materials, labour & t&p etc. 12mm thick internal plaster in 1