Details: excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 mtr etc completed (uppwd sor si -251/2020) concrete with 4.00cm (1½") gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of materials, labour t&p etc. required for the proper completion of the work. (uppwd sor si-281/2020) providing and laying in position specialized grade of reinforced cement concrete excluding the cost of centering ,shuttering ,finishing and reinforcement all work upto plinth level (1:1.5:3 ) (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size (dsr 5.1.2/2023) centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete (d.s.r. no-5.9.1) steel reinforcement for rcc work including straightening cutting bending plecing in position and binding all complete upto plinth level .(dsr5.22.6/2023) road work earth work in fiili
Sector: Urban Authority