Details: construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 (including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) providing, laying and spreading material on a prepared sub base, cement @2% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer of sub-base.(including labour material t&p etc. complete as per direction of e/i & also including all taxes. labour cess but excluding gst) providing, laying and spreading material on a prepared sub base, cement @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with the road ro
Sector: PWD