Description: Development work among newly created plots in Indirapuram extension Name of Work Development work among newly created plots in Indirapuram extension
Details: PART-A (LAYING OF SEWER LINE) Excavation for depth upto 0.00-1.5 m BGL for laying sewer line , man hole and gully pits etc. in ordinary soil (earth sand and clay) i/c cutting of joints pits .Trimming , dressing ,leveling , refilling of trenches in 20 cm layers , watering and ramming the same i/c removal of surplus earth of dismanteled materials upto a distance of 50 cm from centre .Analysis Rate Excavation for depth upto 1.5-3.0 m BGL for laying sewer line , man hole and gully pits etc. in ordinary soil (earth sand and clay) i/c cutting of joints pits .Trimming , dressing ,leveling , refilling of trenches in 20 cm layers , watering and ramming the same i/c removal of surplus earth of dismanteled materials upto a distance of 50 cm from centre .Analysis Rate Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm. nominal s
Sector: Urban Authority