Details: greasing, oiling of all components of lifting mechanism of gate (excluding rollers) after proper cleaning with replacing grease cup/grease as required including cost of all material, labour, t&p etc required for proper completion of work from gate no. 1 to 2. applying cardium compound on steel wire rope, rope drum of gate after proper cleaning including cost of all material, labour, t&p and scaffolding with safety arrangement required for proper completion of work from gate no. 1 to 2. replacing broken/ missing/damaged bolt, nut of hydro mechanical equipment after proper checking of bolt, nut including cost of all material, labour, t&p etc required for proper completion of work from gate no. 1 to 2. repairing of guide roller (side sway roller) by taking out defective guide roller from gate.rethreading of foundation hole after extracting broken foundation bolt.repairing of pinn by remettaling be welding, machining of roller shaft assembling the guide roller and fitting on gates with n