Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m lead upto 30 m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer-in-charge upto a distance of 30 m from the foundation trenches. (s.i. no. 251a) /2022 concrete with 4cm. gauge stone ballast, coarse sand of 2.20 f.m and cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour, t&p etc. required for proper completion of the work. (s.i. no. 281)/2022 m.s or iron work of small sizes and section such as m.s grill/stair case ralling/gates/trusher/racks/ etc. wrought to required from including supply of steel bolts, nuts, wastage etc. and their fixing required for proper completion of the work si. no. 502a/2022 rcc work with cement, approved coarse sand a
Sector: Urban Authority