Details: m 150 class brickwork in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and t&p etc., required for proper completion of work (sor 2020 s.i.no 305+310+310(a)) earth work in filling in embank..up to 8km(as per morth) steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.electric resistance or induction welded tubes. (d.s.r. no-10.16.3) structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (d.s.r. no-10.2) all work upto plinth level: providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work using coarse ag
Sector: Urban Authority