Details: excavation in foundation in ordinary soil including lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal & disposal of surplus earth as directed by e/i upto a distance of 30m from foundation trenches. si .251a concrete with 4cm guage stone ballast,course sand and cement in proportion of 1:5:10 in foundation and under hoorsing all material, labour, t&p etc. required for proper completion of work. (sor no 274+diff m-150 brick work in1:4 cement & four coarse sand in foundation and plinth including supply of all materials, labour, tools & plants etc. required for proper completion of the work. si-305(a) 12 mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 1cm including supply of all materials, labour, t&p etc. required for proper completion of the work. s.i.no-584
Sector: Urban Authority