Details: dismantling brick work or stone work in lime or cement mortar and including stacking of dismantled materials as directed by engineer-in-charge with of 60 mt. (200 feet) dismentling of old & damaged c.c. floor including etc all complete . excavation in foundation in ordinary soil ( loam clay, or sand) including lift upto 1.5 metre (5 fts.) and lead upto 30m (100 fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the bulding and the sides of foundation trenches or into the plinth and removal and disposal of surpluse earth as directed by the engineer-in-charge upto a distance of 30m (100fts) frome the foundation trenches.(s.i. no. 251) providing & laying of c.c. with 20-40mm gauge stone ballast coarse sand and cement in the proportion 1:4:8 including supply of all material , labour and t&p etc .requard for proper comletion of the work. (si-281). 1st class brick work in 1:4 cement & fine sand of 1.25 fm. mortar in foundation and p