Details: supply of material, labour, t&p etc.required for proper barricading along trench during and laying of pipeas per direction of engineer-in-charge (both sides of will be treated as one side for purpose of measurement. dismantling of cc, tar roads for laying sewer including shorting out and stacking serviceable materials and disposal of unserviceable materials upto distance of 60 m. including supply of all materials, labour, t&p etc. required for proper completion of work as per direction of engineer -in-charge. excavation below g.l. upto depth as specified for laying sewer and manhole ordinary soil (earth, sand, loam and clay) including cutting of joints pits ramming dressing) levelling, including supply of all material, labour, t&p etc. required for proper completion of work as per direction of engineer incharge. supply of following sizes of rcc (np3) spigotted and socketed non pressure pipes( dia. in mm). carting following sizes of r.c.c. hume pipe np3. class socket/ spigoted rubber ri
Sector: RDPR