Details: laying and jointing pvc pipe. heading dissmentaling of old and above .5 class accuracy 145 kv ct & pt/ vct of different 132kv bay . the worklncludes opening jumpers and disconnecting earthing (ms flates) and cable terminations,opening of base nut and bolt etc. shifting of ct with the help of crane from bct to ground and then to store with proper stacking.1 a- 145 kv ct on tf/line bays ((at 132 kv substation mau new -63 mva tf -ii - 02 nos. & 132 kv mau old bay- 01 no.),(at 132 kv substation mau old -63 mva tf -i & ii - 06 nos.),(at 132 kv substation haldaharpur, 20 mva tf -i - 02 nos.), (132 kv substation muhammadabad, 63/40 mva tf - 03 nos)) 1 b- 145 kv pt on line bays (at 132 kv substation mau new -132 kv main bus -03 nos.),(at 132 kv substation haldaharpur, 132 kv main bus -03 nos.),(132 kv mau old s/s 132 main bus 03 nos of new of 0.2 class accuracy 145 kv ct & pt at diffrent tf/line bays. the work includes shifting of new ct from store to work site (distance aprox 200 mtr
Sector: Transmission