Details: towan hall counstruction of granular sub- base by providing close graded material, speading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 cement concrete with 2cm gauge approved stone ballast approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials labour and t&p etc. required for proper completion of the work. new item (a) as in item. 279 first class brick work in 1:4 cement and fine sand of 1.25 fm. mortar in foundation and plinth including supply of all materials, labour and t&p etc. required for proper completion of the work.si n0. 305 12 mm cement plaster in single coat on fair side of single of half brick wall for interior plastering upto floor two levle including internal rounded angles chamfers and /or rounded angles not exceeding 80mm in girth and finished even and smooth no ex
Sector: Urban Authority