Details: dismantling of rcc or r.b work including stacking of dismantled materials with in 60m distance as directed by e/i (lump sum quantity) (sor 694/2022) earth work in cutting in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth and earth work in embankment to be in 20cm layers including ramming & dressing the surface to required level & slopes and also including 1.50m lift and 30 m lead the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 mtr. distance as directed by e/i.(excluding royalty & gst) sand filling with local sand including supply of all labour, material and t&p etc. required for proper completion of the work.(sor 2022) concrete with 4 cm gauge stone bllast fine sand of 1.25 f.m. and cement in proportion of 8:4:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (si no. 281/2022) m-150 brick wo
Sector: Urban Authority