Details: excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 metre and lead upto 30 mtr. including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation, trenches or into the plinth and removal & disposal of surplus earth as directed by the engineer in-charge upto a distance of 30m from the foundation trenches. (si. no. 251/2022) concrete with 4 cm gauge stone bllast fine sand of 1.25 f.m. and cement in proportion of 8:4:1 in foundations and under floors including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (si no. 281/2022) rcc works with cement approved coarse sand and 2cm gauge approved stone grit in the proportions 1:1.5:3 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 b.w.g.g.i. binding wire and including necessary centering and shuttering etc. and supply of all materia
Sector: Urban Authority