Details: earth work inexcavation in ordinary soil including lead 30.00 mt & lift 1.5 mt. cartage from 1.0 km distance. all comp. construction of granular sub base by providing well graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and complacting with smooth wheel roller to achieved the desired density. complete as per clause 401. providing laying spreading and compacting stone aggregates of 45-63 mm gauge stone ballast to water bound macadam specification including spreading in uniform thickness, hand packing rolling with 3-wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density. providing laying spreading and compacting stone aggregates of 22.4-53 mm gauge stone ballast to water bound macadam specification including spr
Sector: RDPR