Details: dismantling of old interlocking tiles pavement including stacking of serviceable material and disposal of unserviceable material within lead of 50m as per direction of engineer in charge. cartage of ballast, kankar, coat, grit or sand etc. including loading and unloading but excluding stacking on pucca roads.up to 8 km distance providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (dsr sn-4.1.10) providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors. (dsr sn-4.1.3) class-150 (non modular) brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labor t&p etc. required for proper completion of work. (s.no. 6.1.1) 12mm thick cement plaster in single coat of fai
Sector: RDPR