Details: construction of box culverts(3x6.0mter span) excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (excluding royality). sor sno- 251 cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and t&p etc. required for proper completion of the work. (sor sno-280) brick masonary work in cement motar (in 1:3 cement and coarse sand) in foundation complete excluding pointing and plastering as per drawing and technical specification. (morh clauses 1300)) sand filling in foundation trench as per drawing and technical specification sor-255 providin
Sector: Industry Development