Details: dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead.(15.56) demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) (15.2.1) demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge: in cement mortar (15.7.4) demolishing lime concrete manually / by mechanical means and disposal of material within 50 metres lead as per direction of engineer in charge. (15.1) earth work in excavation by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including d
Sector: Science University