Details: earth work in excavation in foundation in ordinary soil loam clay sand including dressing of side and ramming of bottoms, lift up to 1.5 m and lead upto 30 m and including filling watering and ramming of excavated soil in to trenches or space between and the sides of fdns. trenches or in to the plinth remooval and disposal of surplus excavated soil as directed engineer incharge up to a distance of 30m. si no.251a/sor-2022 cement concrete with 4cm gauge approved stone ballast coarse sand & cement in the propotion of 8:4:1 including supply of all material labour, tools & plants required neccassary centering and shuttering etc. and supply of all materials, labour tools & plants required for proper completion of work. s.i.no.281/2022 m-150 brick work in one 1:4 one cement & coarse sand foundation and plinth including supply of all matarials labour, tools & plants etc. requierd for proper completion of the work as per direction of engineer-in-charge (sor-305a/2022) 40 mm thick d.p.c wit
Sector: Urban Authority