Details: earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sum on plan) including disposal of excavated earth, lead upto 50m and all lift upto 1.5m, disposed earth to be levelled and neatly dressed:all kinds of soil cast in situ cement concrete m 20 kerb with channel (construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in m 20 grade pcc on m10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in pcc m20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408)using concrete mixer painting two coats on new concrete surfaces (painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces) supplying and fixing of chain link fencing with angle iron posts 50x50x6mm pla
Sector: Urban Authority