Details: earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of standard proctor's density with initial lift of 1.5m (excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. compaction of earth or highly weathered strata. by manually or plain roller. (density 90% of proctor) watering of earth including cost of carriage of water when source of water is up to 1 km
Sector: Irrigation