Details: Servicing work of room/desert cooler, after opening the motor and pump, giving grease oil inside it, closing it back, installing cooler pads, cleaning the cooler thoroughly.Room / Desert Cooler Red Oxidizing Rubber Painting Inside Body and Oil / Enamel Painting Outside Body MaterialOpening and fitting of the complete new binding of the cooler fan, only rubber painting in the cooler tank with materialReplacement of shaft and bush of cooler motorNew blade of cooler motor. install new pump in coolerOne H.P. Binding of motor water pump with material Service by opening ceiling fan Oil grease materialnew modelPutting new bearings in old model ceiling fan1/2 M.P. Motor Water Pump: Complete new bindingmy materialDoingNew binding of ceiling fan, opening and fitting and old modelto placenew model• Single ped 2 x 2 thickness 4 inchSingle Ped 2 X 3 Thickness 4 InchSingle pad 2 x 4 thickness 6 inch cooler lead 3 meterexhaust fanWinding of exhaust fan• Cooler Grill
Sector: District Administration