Details: paniev, digging the soil up to a depth of 15 in the ditch paranal, pounding the bottom, pouring water. carrying out the excavated soil after filling the foundation, re-filling the empty sewers with soil and disposing of the remaining soil up to a distance of 50 meters (in hard soil) transportation of soil for different distances, unloading and stacking including. the length of the transport will be calculated from the nearest route and not by road.
Sector: Zilla Parishad