Details: work details digging soil to a depth of 1.5 in the foundation, trench, groove, crushing the floor, pouring water, grooming the armpit, taking out the carved soil, replenishing the vacant soil after filling the foundation and the remaining soil meter to salvage to a distance of. 40 mm in cement concrete foundation in hard soil. stone ballast cement sand spice of nominal measure, mixing, pouring and mopping in cement: 5 sand: 10 ballast ratio, including terai. the foundation of the stone in the foundation and the chair - dhoka masonry cement - gravel 1: 6 in spices, closing of myrtle and terai etc. those stone stones in the superstructure - dhoka masonry cement - gravel 1: 6 in spices, closing of the side of the mule and the valley. coping work 50 m. m cement concrete 124 mix in thickness comprising 1 cement 2 gravel 4 stone 12.
Sector: RDPR