The Jaipur PHED Chief Engineer has published a tender for "Drilling of 200 mm Nominal Diameter Boreholes for Construction and Commissioning of tube well for District Banswara 5 year O and M Period including 2 year defect liabilityperiod" on the 02 Mar 2026. This tender belongs to Tube Well category. This tender is published in Udaipur, Rajasthan location. The vendors interested in this tender and related Tube Well tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | water supply works Tenders | tubewell Tenders
Related categories: Canal construction service Tenders | Main Canal Construction Tenders | Distributary Canal Construction Tenders |
Jaipur PHED Chief Engineer issued 1,703 tenders for Tube Well last year
With, 119 floated just last month.
| Tender Title | Drilling of 200 mm Nominal Diameter Boreholes for Construction and Commissioning of tube well for District Banswara 5 year O and M Period including 2 year defect liabilityperiod |
|---|---|
| Tender Description | construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by dth system as per is:2800 part 1: 1991 and is:2800 part ii: 1979 (both amended up to date) and technical specifications. the work shall be deemed completed only after obtaining sand free water. the bore well should have a throughout nominal size bore beyond casing pipe. nominal bore 200 mm dia. add 15% extra on above item (item no 2.3.1 to 2.3.3) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. add 30% extra on above item (item no 2.3.1 to 2.3.3) for drilling depth beyond 200 mtr and from ground level, rate shall be applicable for only extra depth beyond 200 mtr . add 15% extra on above item (item no 2.3.1 to 2.3.3) for drilling, where strata is collapsible and lowering of casing pipe is required . the work includes lowering of casing pipe, but exclu |
| Comments | construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by dth system as per is:2800 part 1: 1991 and is:2800 part ii: 1979 (both amended up to date) and technical specifications. the work shall be deemed completed only after obtaining sand free water. the bore well should have a throughout nominal size bore beyond casing pipe. nominal bore 200 mm dia. add 15% extra on above item (item no 2.3.1 to 2.3.3) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. add 30% extra on above item (item no 2.3.1 to 2.3.3) for drilling depth beyond 200 mtr and from ground level, rate shall be applicable for only extra depth beyond 200 mtr . add 15% extra on above item (item no 2.3.1 to 2.3.3) for drilling, where strata is collapsible and lowering of casing pipe is required . the work includes lowering of casing pipe, but exclu |
| Published Date | |
|---|---|
| Due Date | 13 Mar 2026 00:00:00 |
| Estimated Value | 1.5 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |