The Jodhpur Public Health Engineering Department CE Project has published a tender for "Deepening and Desilting of Open Well at Sadulaniyo ka tala moodho ka tala under DMFT" on the 08 Dec 2025. This tender belongs to Open Well Based WSS category. This tender is published in Barmer, Rajasthan location. The vendors interested in this tender and related Open Well Based WSS tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: water supply works Tenders | all civil works Tenders | open well Tenders
Related categories: Airport Runway Repair Tenders | Road Paving Tenders | Road Relaying Tenders |
Around 22187 tenders were floated in Rajasthan in the past month with major spending on construction materials Tenders, school repairs Tenders, road construction Tenders
| Tender Title | Deepening and Desilting of Open Well at Sadulaniyo ka tala moodho ka tala under DMFT |
|---|---|
| Tender Description | earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 sqm in plan) for construction of open well, lift up to 1.5 mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter.ordinary rock hard rock add extra over item no. 2.39.2-4 for every additional lift of 1.5 mtr. or part thereof : in ordinary rock and hard rock. 57.00 to 58.5 mtr. 58.50 to 60.00 mtr. 60.00 to 61.50 mtr. 61.50 .to 63.00 mtr. 63.00 to 64.50 mtr. 64.50 to 66.00 mtr. 66.00 to 67.50 mtr. add 20% extra over item no. 2.39 for excavation in saturated soil where pumping or baling out of water is required, including shoring strutting where required and dewatering.(for ordinary rock) add 20% extra over item no. 2.39 for excavation in saturated soil where pumping or baling out of water is required, including shoring strutting where required and dewatering.(for hard rock) reinforced cement concrete work in circular well upto require |
| Comments | earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 sqm in plan) for construction of open well, lift up to 1.5 mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter.ordinary rock hard rock add extra over item no. 2.39.2-4 for every additional lift of 1.5 mtr. or part thereof : in ordinary rock and hard rock. 57.00 to 58.5 mtr. 58.50 to 60.00 mtr. 60.00 to 61.50 mtr. 61.50 .to 63.00 mtr. 63.00 to 64.50 mtr. 64.50 to 66.00 mtr. 66.00 to 67.50 mtr. add 20% extra over item no. 2.39 for excavation in saturated soil where pumping or baling out of water is required, including shoring strutting where required and dewatering.(for ordinary rock) add 20% extra over item no. 2.39 for excavation in saturated soil where pumping or baling out of water is required, including shoring strutting where required and dewatering.(for hard rock) reinforced cement concrete work in circular well upto require |
| Published Date | |
|---|---|
| Due Date | 12 Dec 2025 00:00:00 |
| Estimated Value | 5.0 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |