The Bharatpur Urban Improvement Trust has published a tender for "Sewer utility work as required in the field of Executive Engineer Third Annual contract" on the 30 Oct 2025. This tender belongs to Sewer Pipe Laying category. This tender is published in Jodhpur, Rajasthan location. The vendors interested in this tender and related Sewer Pipe Laying tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: drainage and sewerage pipelaying Tenders | sewer line construction Tenders | all civil works Tenders
Related categories: Barrage cum Bridge Tenders | Airport Runway Tenders | Airport Runway Repair Tenders |
| Tender Title | Sewer utility work as required in the field of Executive Engineer Third Annual contract |
|---|---|
| Tender Description | earth work for sewer line and manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. carriage of materials by mechanical transport including loading, unloading and stacking :: earth lead up to 5 km. providing granular bedding having width = outer dia of pipe (bc) + 500mm, thickness below pipe = 0.25bc or 100mm (whichever is higher) and haunching = 0.5bc, with graded hard crusher bro |
| Comments | earth work for sewer line and manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. carriage of materials by mechanical transport including loading, unloading and stacking :: earth lead up to 5 km. providing granular bedding having width = outer dia of pipe (bc) + 500mm, thickness below pipe = 0.25bc or 100mm (whichever is higher) and haunching = 0.5bc, with graded hard crusher bro |
| Published Date | |
|---|---|
| Due Date | 12 Nov 2025 00:00:00 |
| Estimated Value | 9.61 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |