Details: excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect (a). hard/ dense soil ( quantity as per e/w calculation sheet) providing laying & fixing in position rcc spun or hume pipe (is 458-2003) with collars in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar (1:3) perfectly air tight including testing of joints class np-3 1000 mm dia
Sector: Irrigation