Details: name of work construction of shilpgram at dungarpur earth work in excavation/ by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed: hard rock (b
Sector: Tourism