Details: silt clearance of drains, channels and canals with lift 1.5 mtr and lead up to 50 mtr. dismantling of existing structures like culverts, bridges, retaining walls, cc road and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of cement concrete grade m-15 and above and pcc blocks50 earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level. in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. depth upto 1.5 m random rubble stone maso
Sector: RDPR