Details: cutting and clearance of jungle, bushes, shrubs ankra/ipomoea, juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the engineer-in-charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting. for dowels and outer slopes. cutting and uprooting of trees including removing of roots and filling of hole, cutting/up rooted would be property of the department 7.5 cm to 15 cms girth ploughing and picking of surface of old embankment benching base and disposal of the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneum
Sector: Water Resource Department