Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level. in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. depth upto 1.5 m carriage of materials bymechanical transport including loading,unloading and stacking :: earth for 1 km centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting,propping etc. and removal of form for :foundations, footings, bases of columns, etc. for mass concrete providing and laying lean cement concrete 1:4:8 in sub- base over a prepared sub-grade with coarse and fine aggregate conforming to is: 383, the size of coarse aggregate not ex
Sector: RDPR