Details: dressing of earth work in surface excavation including cutting and filling upto 30cm depth including disposal of excavated earth upto 50m and lift upto 1.5 m. earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level.in all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.depth upto 1.5 m providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level 1:4:8 (1 cement : 4 fine / coarse sand : 8 graded stone aggregate 40 mm nominal size) pcc for drane random rubble masonry with hard stone in foundation and plinth :cement mortar 1:6 (1 cement : 6 coarse sand) providing
Sector: RDPR