Details: conducting fresh detailed physical survey total station survey machine (dgps) with built-up area upto 10% – per hectare. general conditions :- 1. for built-up area more than 10% the rates shall be as under :-sr.no. type of area rates payablea) fresh works upto 10% built up quoted rate1 for built up area 10% to 50% - 1.5 times of quoted rate2 for built up area above 50 % - 2.0 times of quoted rate b) updation works 1 for built up area up to 10%- 0.25 times of quoted rate2 for built up area up to 10% to 50%- 0.375 times of quoted rate3 for built up area above 50% 0.5 times of quoted rate2. the survey work shall include total station machine survey (dgps), revenue map, mdp-2025 and relevant zdp, mdp-2011 and schemes approved on or adjacent to the site, boundary walls, built-up, other structures & features on or adjacent to the site and any other layer as required by jda.3. the absolute accuracy of the survey shall be less than 10 cm.4. work shall be done by total station machine and re
Sector: Urban Authority