Details: particulars part "a" civil work : surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of lead up to 50 mtr. and lift up to 1.5 mtr.: all kinds of soil earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to 1.5 mtr. including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. all kinds of soil filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. 1:4:8 (1 cement : 4 c
Sector: Medical and Health