Details: earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths, below natural ground / road top level.in all types soils/ saturated soil such as morrum, sand, sandy silt, clay, black cotton soil, kankar, etc. bsr wrd chapter-v -2023 iteam no 15.1 providing and laying in position of cement concrete nominal mix (1:4:8) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. well graded crusher broken stone aggregate of maximum size upto 20 mm bsr wrd-2023 chapter-ix iteam no 9-d random rubble stone masonry (using r. r. stones where 75 % stones to be not le
Sector: Forest and Environment