Details: 16.14 transfer of dam / canal alignment from sajra map to the ground and taking levels by auto level or dgps, developing l-section and x-section and submitting in hard copy three sets and soft copy in auto cad format, using layer system, showing all features. (total length of l-section and xsection to be measured for payment)16.14.1.3 l-section of dam/ canalin plain area - levels for l-section to be taken at interval 30 meter. assistance for pre survey work and re-allotment of new field boundaries for help of authorized amin by govt. to revenue agency by traditional method (only for ofd works under cma 2023-24)(as per ce (east) and adll. secretary cad jaipur letter no.4458 dated 05.01.2024) supply of 3 cm x 3 cm x 30 cm size wooden pegs (babul, mango or teak wood etc.) 18.8 dag belling18.8.2 over 7.5 cm to 10 cm deep 18.1 cutting and clearance of jungle, bushes, shrubs ankra/ipomoea, juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per inst
Sector: Irrigation