Details: part "a" civil work demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge: in cement mortar. demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 meter lead. centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. providing and fabricating reinforcement for r.c.c. wor
Sector: School